Before and after: rebuilds and renovations

Rebuild Pro Contracting rebuilds water-damaged basements, kitchens and bathrooms and completes planned renovations across Toronto and the GTA. Each project below lists the trades involved and how long that kind of job takes.

Insurance rebuilds

Photo to comeBefore
Photo to comeAfter

Insurance rebuild · Richmond HillSample scope

Basement rebuild after a sump pump failure

Finished basement with two inches of standing water. Perimeter flood cut, new insulation and drywall, vinyl plank flooring, trim and paint.

Trades:
Insulation, Drywall and taping, Flooring, Painting and trim
Typical duration:
3 to 5 weeks
Photo to comeBefore
Photo to comeAfter

Insurance rebuild · MarkhamSample scope

Kitchen rebuild after a supply line leak

Fridge water line leak under hardwood. Base cabinets, subfloor and hardwood replaced, basement ceiling below repaired.

Trades:
Kitchens and bathrooms, Flooring, Plumbing, Drywall and taping
Typical duration:
4 to 6 weeks
Photo to comeBefore
Photo to comeAfter

Insurance rebuild · VaughanSample scope

Two-storey repair after a burst pipe

Second-floor bathroom supply failure. Bathroom floor rebuilt, main-floor ceiling and walls replaced, hardwood refinished.

Trades:
Plumbing, Drywall and taping, Flooring, Painting and trim
Typical duration:
4 to 6 weeks
Photo to comeBefore
Photo to comeAfter

Insurance rebuild · North YorkSample scope

Condo repair after a leak from the unit above

Ceiling and wall drywall replaced, engineered hardwood relaid over acoustic underlay, full repaint.

Trades:
Drywall and taping, Flooring, Painting and trim
Typical duration:
2 to 3 weeks

Renovations

Photo to comeBefore
Photo to comeAfter

Renovation · EtobicokeSample scope

Bungalow basement finished with a bathroom

Unfinished block-wall basement turned into a recreation room, bedroom and three-piece bathroom, with permit and inspections.

Trades:
Basement finishing, Framing, Electrical, Plumbing
Typical duration:
8 to 10 weeks
Photo to comeBefore
Photo to comeAfter

Renovation · TorontoSample scope

Main bathroom gut renovation

Original bathroom in a semi-detached house taken back to the studs. New plumbing, waterproofed shower, heated tile floor.

Trades:
Kitchens and bathrooms, Plumbing, Electrical
Typical duration:
3 to 4 weeks